LicensedInsuredFamily-owned40 years of experience100% satisfaction guarantee
As seen onWFAAABC Dallas–Fort Worth
Call nowBook service
← All services

Residential service

Residential New Construction Plumbing

A new home's plumbing starts long before the faucets go in. We coordinate water, drain, and vent layouts with your builder so the system fits the plans, meets local requirements, and can be tested before walls and floors are closed.

  • Water, drain, and vent rough-in
  • Builder coordination and required inspections
  • Fixture installation and final testing
Residential New Construction Plumbing by Jensen Plumbing in Denton County, TX

Talk to a master plumber

Call for residential new construction plumbing anywhere in Denton County.

214-287-0445

Plan before the pour

Review floor plans, fixture locations, supply needs, and sewer connections with your builder before rough-in begins.

Rough-in through finish-out

Install and test piping, coordinate required inspections, and connect fixtures at finish-out. Confirm the scope and project schedule before work starts.

Why it matters

Why residential new construction plumbing is worth doing right

Thoughtful plumbing planning helps prevent hidden leaks, poor drainage, and difficult maintenance access in a new home. Layout and testing are easier to get right before concrete is poured or walls are closed than after the finishes are installed.

How we get it done

  1. 1

    Review plans and scope

    We discuss fixture choices, water demand, utility connections, and the builder's schedule. Permit and inspection responsibilities are agreed before installation.

  2. 2

    Install and test rough-in

    Water, drain, and vent piping is installed for the approved layout, tested, and presented for required inspections before being concealed.

  3. 3

    Finish and verify

    Fixtures and appliances within the plumbing scope are connected, shutoffs are checked, and the system is tested for leaks and drainage.

Signs you need residential new construction plumbing

Decide fixture locations early

Bathroom groups, kitchen sinks, laundry connections, and water heater locations affect drain routes and supply sizing. Late changes can require rework, especially after a slab pour.

Coordinate each inspection

Local requirements and construction stages determine when piping can be covered. Testing and inspections need to be coordinated with the builder rather than left until move-in.

Before we arrive

Bring plans, fixture specifications, utility connection information, and your builder's contact. Ask which permits, inspections, and finish-out items are included.

Preventing it next time

Keep plumbing plans and test records, label accessible shutoffs, and follow fixture and water heater maintenance instructions after move-in.

FAQ

Common questions

When should a plumber join a new construction project?

Before underground rough-in or the slab pour, so fixture locations, utilities, and drainage can be planned with your builder.

Does new construction include fixture installation?

It can include rough-in and finish-out. Confirm the exact fixtures, appliances, and stages in your written scope.

Can fixture locations change after rough-in?

Sometimes, but moving supplies, drains, or vents can add work and affect the schedule. Review changes before walls or floors are closed.

Available in

Word of mouth

Neighbors who'd call us again.

★★★★★

Read current, verified customer feedback on Jensen Plumbing's Google Business Profile.

Read Google reviews